Skip directly to main content.

Maritime Engineering (Marine Services)

 

Opus has a strong track record of marine engineering across a broad range of disciplines from engineering and science to planning and property.  Opus has specialists in this area who have developed strong relationships with a large number of organisations through the delivery of innovative, appropriate and cost effective solutions.

For more information please contact:
Gary Chalmers
20 Moorhouse Avenue
PO Box 1482
Christchurch
New Zealand
Tel+64 3 363 5400
Fax +64 3 365 7858
Direct +64 3 363 5504
Mob +64 27 273 9727
Email Gary.Chalmers@opus.co.nz

For more information please contact:
James Park
Road Asset Management Engineer
20 Moorhouse Avenue
Christchurch 8011
New Zealand
Tel +64 3 363 5400
Fax +64 3 365 7858
Email James.Park@opus.co.nz

Show all Maritime Engineering (Marine Services) Project Profiles

Venture Quays, Isle of Wight, United Kingdom

Opus’ Venture Quays project on the Isle of Wight, won the Overall Prestige Award & Maritime Award from ICE Southern Branch in 2007.   The project required an economic and robust design to extend the usable quay-side facilities in front of Venture Quays from 1500m˛ to 8500m˛.

Find out more.. 
                                                                                   

HMS President, River Thames, United Kingdom

Opus completed a new deck structure for HMS President on the River Thames. Although titled HMS this is the shore based London HQ of the Naval reserve, with jetties out into the river. Downstream from St Katharine’s Dock, with its spectacular views of Tower Bridge, it is used for both Ministry of Defence training and corporate entertaining.

Find out more.. 
                                                                                   

Royal Yacht Squadron Project, Isle of Wight, United Kingdom

Opus was commissioned to design the marina alongside the Club House.  The design saw a series of caissons positioned on the seabed, linked together to form a “J-shaped’ breakwater.  The caissons were filled with ballast and a rock seawall created to protect the mooring pontoons. 

Find out more..